12 Bay Beverage Truck (Wrapped) –7 days
Refinished cab, entire beverage body then wrapped
Concrete Mixers – 7 days
Paint cab, barrel, pedestals, water tower, tank and chassis. Including removal of all the concrete from the hopper
40 Meter Concrete Pumps – 14 days
3 colors. Refinish cab, boom, the boom pipes, hydraulic pumps, hydraulic lines, hopper, deck and outriggers